PDU plugs into Rackmount UPS 2 · AC-only · Front U3–U4
Connected equipment load
620 W
Est. PDU input current
5.4 A120 V AC · From entered amps or VA
PDU input limit
15 A
UPS outlet limit
15 A
1 plug assigned · 7 available
Device
Plugs
Input W
Est. input A
Front U19
1
620 W
5.4 A
PDU · 0U Rear right
PDU plugs into Rackmount UPS 1 · Battery-backed · Front U1–U2
Connected equipment load
600 W
Est. PDU input current
5.3 A120 V AC · From entered amps or VA
PDU input limit
15 A
UPS outlet limit
15 A
1 plug assigned · 7 available
Device
Plugs
Input W
Est. input A
Front U5–U6
1
600 W
5.3 A
Rack-room heat estimate8,085 BTU/hr2,369.58 W local heat
Outlets are counted at the source each device plugs into. Add each PDU or UPS as its own equipment row to assign loads to it. Upstream watt and VA totals count each load once. Watts and VA for PDUs and UPSs show the load on their outlets. Current is tracked at the wall circuit, PDU input, and UPS output. Current uses entered input amps or VA when available. Watts-only entries use the specified input power factor or the 0.90 planning assumption.
Power source
Level
Outlets
Entered watts
Entered VA
Est. current
Source limits
Wall circuit20 A breaker · 120 V AC
NEMA L5-20R
1 / 2 used1 free
2,112.24 W
N/A
18.3 A120 V AC · Includes watts converted using input PF2.3 A over continuous planning limit
20 A breaker
Wall circuit20 A breaker · 120 V AC
NEMA L5-20R
1 / 2 used1 free
992.34 W
N/A
8.6 A120 V AC · Includes watts converted using input PF
20 A breaker
UPS outputFed by Circuit A
Battery-backed · 5 / 8 used3 free
AC-only · 0 / 2 used2 free
1,990 WBattery-backed · 1,990 WAC-only · 0 W
2,130 VA
17.8 A120 V AC · From amps or VA
2,160 W / 2,400 VA
PDU inputFed by Rackmount UPS 2 · AC-onlyVerify UPS outlet and outlet-group limits.
1 / 8 used7 free
620 W
650 VA
5.4 A120 V AC · From amps or VA9.58 A estimated remaining
15 A / 1,800 W
PDU inputFed by Rackmount UPS 1 · Battery-backedVerify UPS outlet and outlet-group limits.
1 / 8 used7 free
600 W
630 VA
5.3 A120 V AC · From amps or VA9.75 A estimated remaining
15 A / 1,800 W
UPS outputFed by Circuit B
Battery-backed · 2 / 6 used4 free
AC-only · 1 / 4 used3 free
970 WBattery-backed · 350 WAC-only · 620 W
1,225 VA
10.2 A120 V AC · From amps or VA
1,440 W / 1,500 VA
Circuit planning and A/B failover
Current uses entered RMS amps, then VA, then watts and input power factor (0.90 when unspecified). The continuous-load check uses 125% of continuous amps plus noncontinuous amps for standard-rated assemblies. Warning levels are 70% and 90% of the applicable limit. Continuous-load guidance
Circuit
Base load
Current
Diversity and growth scenario
Circuit A
2,112.24 W
18.3 A
2,323.47 W · 20.2 A100% diversity · 10% growthOver the continuous planning limit
Circuit B
992.34 W
8.6 A
Set in wall circuit settings
A/B failover
Each scenario models sustained loss of one wall circuit after UPS batteries run down. Single-fed equipment on that circuit loses power.
40% shortcut example: Two equal 20 A feeds each carry 8 A normally. If all load transfers, the survivor carries 16 A. The results below use the assigned transfer paths and entered limits.
Circuit A lost
Load transfers: Analytics server.
Power lost: 48-port PoE switch, Video recording server, Storage server.
Surviving circuit
Normal
After transfer
Continuous limit
Circuit B
8.6 A
14.4 A
16 A
Rackmount UPS 2 · 1,590 W exceeds 1,440 W rating.
Rackmount UPS 2 · 1,885 VA exceeds 1,500 VA rating.
Circuit B lost
Load transfers: Management server.
Power lost: 24-port PoE switch.
Surviving circuit
Normal
After transfer
Continuous limit
Circuit A
18.3 A
21.5 A
16 A Over limit · 21.5 A on failover · 16 A planning limit
Rackmount UPS 1 · 2,340 W exceeds 2,160 W rating.
Rackmount UPS 1 · 2,705 VA exceeds 2,400 VA rating.
UPS runtime calculator
Size the UPS from its backed-up load and compare battery energy requirements for different runtimes.
The demo starts with example battery energy and efficiency values. Use your UPS and battery specifications for an actual design.
UPS sizing and runtime targets
Backed-up load
1,990 W / 2,130 VAUses entered amps or VA
Minimum UPS rating with 20% headroom
2,556 VA / 2,388 W
Suggested UPS size class
3,000 VA
Target runtime
Energy at UPS output
Usable battery energy at 90% efficiency
5 min
166 Wh AC
185 Wh DC
15 min
498 Wh AC
553 Wh DC
30 min
995 Wh AC
1,106 Wh DC
60 min
1,990 Wh AC
2,212 Wh DC
Runtime targets use 1,990 W. Check the selected UPS’s W and VA ratings and input requirements. UPS sizing guidance
Use identical packs approved for the UPS. For VRLA, use short-duration discharge data at the planned load.
Use manufacturer runtime data
Enter two points from the same UPS runtime curve for the selected number of battery packs. Pick points that bracket your load. Runtime is interpolated between them.
About 29 minEstimated runtime at 1,990 W with 1 external pack
Battery configuration
Total runtime
Added vs. UPS only
UPS only
About 15 min
—
1 external pack
About 29 min
About 15 min
Runtime in minutes = total usable DC Wh × efficiency as a decimal ÷ load W × 60.
Current uses entered amps or VA where available. Watts-only inputs use the equipment power factor or the 0.90 planning assumption. Set the UPS output voltage and verify the manufacturer’s runtime data at the planned load.
Entered UPS receptacle limit: 15 A. Check plug compatibility and the shared outlet-group limit.
Keep the bonding conductor as short and straight as practical. Avoid sharp bends.
Bonding checks
Verify
48-port PoE switch · specify the unit bonding conductor (UBC) part number.
Verify
24-port PoE switch · specify the unit bonding conductor (UBC) part number.
Conductor, lugs and installation notes
Rack reports
Review fit, source loads, and the materials to order.
Upstream input load 3,104.58 W
Equipment weight 377 lb512 lb loaded
Position
Equipment
Qty
U per item
Total U
Depth
Input W
Weight
Power source
Bonding method
Front U24
1
1U
1U
4 in
0
3 lb
No power required
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U23
In all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC) requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack ground or directly to the common bonding network (CBN). The equipment rack should also be connected to the CBN with a 6 AWG grounding wire. Grounding lugs must be installed on the location marked on the chassis only.
1
1U
1U
18 in
420
18 lb
Rackmount UPS 1 · Battery-backed
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U22
1
1U
1U
2 in
0
2 lb
No power required
No separate bond specified
Front U21
1
1U
1U
4 in
0
3 lb
No power required
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U20
1
1U
1U
6 in
0
3 lb
No power required
No separate bond specified
Front U19
In all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC) requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack ground or directly to the common bonding network (CBN). The equipment rack should also be connected to the CBN with a 6 AWG grounding wire. Grounding lugs must be installed on the location marked on the chassis only.
1
1U
1U
18 in
620
18 lb
AC-only PDU
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U14–U18
1
5U
5U
—
0
1 lb
No power required
No separate bond specified
Front U12–U13
Verify the mounting hardware and any bonding required for the selected shelf.
1
2U
2U
10 in
0
8 lb
No power required
No separate bond specified
Front U11
Demo assumes protective earth through the power cord. Check the model instructions and project requirements for any separate chassis bond.
1
1U
1U
30 in
350
55 lb
Rackmount UPS 2 · Battery-backed
No separate bond specified
Front U9–U10
Demo assumes a manufacturer-approved chassis bonding point. Verify the terminal and hardware for the selected model.
1
2U
2U
30 in
620
55 lb
Rackmount UPS 1 · Battery-backed
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U7–U8
Demo assumes protective earth through the power cord. Check the model instructions and project requirements for any separate chassis bond.
1
2U
2U
27 in
350
38 lb
Rackmount UPS 1 · Battery-backed
No separate bond specified
Front U5–U6
Demo assumes protective earth through the power cord. Check the model instructions and project requirements for any separate chassis bond.
1
2U
2U
30 in
600
55 lb
Battery-backed vertical PDU
No separate bond specified
Front U3–U4
Demo assumes a manufacturer-approved chassis bonding point. Verify the terminal and hardware for the selected model.
1
2U
2U
23 in
—
43 lb
Circuit B
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U1–U2
Demo assumes a manufacturer-approved chassis bonding point. Verify the terminal and hardware for the selected model.
1
2U
2U
23 in
—
54 lb
Circuit A
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Rear U24
1
1U
1U
6 in
0
4 lb
No power required
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Rear U23
1
1U
1U
3.5 in
0
2 lb
Rackmount UPS 2 · AC-only
No separate bond specified
Rear U21
1
1U
1U
1 in
0
2 lb
No power required
No separate bond specified
Rear U18
1
1U
1U
3.5 in
0
2 lb
No power required
No separate bond specified
Rear U13
1
1U
1U
3.5 in
0
2 lb
No power required
No separate bond specified
Rear U6
1
1U
1U
3.5 in
0
2 lb
No power required
No separate bond specified
Vertical 0U · Rear right
1
0U
0U
—
0
7 lb
Rackmount UPS 1 · Battery-backed
No separate bond specified
Rack 01 · 24U · Floor cabinet · 4-post
Upstream input load 3,104.58 W
Equipment weight 377 lb512 lb loaded
FRONT ELEVATION19″ RACK
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
24-port patch panel1U
48-port PoE switch1U
Video recording server2U
Rackmount UPS 12U
Analytics server2U
Cable manager1U
Cable manager1U
Patch panel1U
24-port PoE switch1U
Storage server2U
Blanking panel5U
Rackmount UPS 22U
Management server1U
Equipment shelf2U
0U
U1 at bottomSchematic elevation
Rear left · Vertical rack bonding busbar (RBB) · Right in this viewFront right · Rack bonding strip (RBS)Unit Bonding Conductor (UBC)
REAR ELEVATION19″ RACK
Red shading = chassis overlapU6
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
Front · Video recording serverNo depth left
Front · Rackmount UPS 11″ depth left
Front · Analytics serverNo depth left
Front · Cable manager26″ depth left
Front · Cable manager22″ depth left
Front · 24-port PoE switch8″ depth left
Front · Storage serverNo depth left
Front · Rackmount UPS 25″ depth left
Front · Management serverNo depth left
Front · Equipment shelf18″ depth left
Rear horizontal cable manager1U
Patch panel1U
AC-only PDU1U
Cable manager1U
Cable manager1U
Cable manager1U
0UPDU
U1 at bottomSchematic elevation
Dashed outlines show front equipment. Depth left accounts for its chassis and clearance.
Rear right · Battery-backed vertical PDU · 0URear left · Vertical rack bonding busbar (RBB)Unit Bonding Conductor (UBC)
Side elevation
FRONT28″ BETWEEN RAILSREAR
Red shading = chassis overlapU6
Inside of closed front door
4″ ahead of front rail
Inside of closed rear door
5″ behind rear rail
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
4″ 24-port patch panel
18″ 48-port PoE switch
2U · 27″ Video recording server
2U · 23″ Rackmount UPS 1
1″ Rear horizontal cable manager
6″ Patch panel
2U · 30″ Analytics server
3.5″ AC-only PDU
2″ Cable manager
6″ Cable manager
4″ Patch panel
18″ 24-port PoE switch
2U · 30″ Storage server
2U · 23″ Rackmount UPS 2
30″ Management server
2U · 10″ Equipment shelf
3.5″ Cable manager
3.5″ Cable manager
3.5″ Cable manager
-5″0″5″10″15″20″25″30″35″
1″ grid from front railFront-mounted →← Rear-mountedStriped = clearanceDashed = inside of closed doorsAmber band = chassis past rear railDotted teal = 0U channelTeal band = 0U accessoryGold line = 4-post mounting required
Rack dimensions and capacity
Mounting width 19 in · Post spacing 28 in · Front clearance 4 in · Rear clearance 5 in · Side space 3 in · Exterior depth 40 in
Reserved front 0U · Unreserved front 5U · Largest front opening 5U · Automatic blanking off
Rack Bonding and 0U accessories
RBB installed or planned
Yes
Rack connection
Rack bonding busbar (RBB)
Upstream bonding path
Dedicated TEBC to SBB · TR-01 (example)
Conductor and route
Demo route: rack bonding busbar to TR-01 SBB via a dedicated TEBC.
Lugs and terminations
Unspecified
Notes
Demo assumes the rack frame is bonded to the RBB. Verify the equipment bonding points, conductor and terminations against the project requirements and manufacturer instructions. Confirm rear cable and service clearance at the RBB on site.
Vertical rack bonding busbar (RBB) · 0U Rear left · Qty 1 · DEMO-RBB · Field check: verify rear cable bend space and access to the RBB lugs with the rear door closed.
Rack bonding strip (RBS) · 0U Front right · Qty 1 · DEMO-RBS
Front left
Open
Front right
Rack bonding strip (RBS) ×1
Rear left
Vertical rack bonding busbar (RBB) ×1
Rear right
Battery-backed vertical PDU ×1
Rear center
Open
Equipment schedule
Position
Equipment
Qty
U per item
Total U
Depth
Input W
Weight
Power source
Bonding method
Front U24
24-port patch panel
1
1U
1U
4 in
0
3 lb
No power required
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U23
48-port PoE switchIn all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC) requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack ground or directly to the common bonding network (CBN). The equipment rack should also be connected to the CBN with a 6 AWG grounding wire. Grounding lugs must be installed on the location marked on the chassis only.
1
1U
1U
18 in
420
18 lb
Rackmount UPS 1 · Battery-backed
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U22
Cable manager
1
1U
1U
2 in
0
2 lb
No power required
No separate bond specified
Front U21
Patch panel
1
1U
1U
4 in
0
3 lb
No power required
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U20
Cable manager
1
1U
1U
6 in
0
3 lb
No power required
No separate bond specified
Front U19
24-port PoE switchIn all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC) requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack ground or directly to the common bonding network (CBN). The equipment rack should also be connected to the CBN with a 6 AWG grounding wire. Grounding lugs must be installed on the location marked on the chassis only.
1
1U
1U
18 in
620
18 lb
AC-only PDU
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U14–U18
Blanking panel
1
5U
5U
—
0
1 lb
No power required
No separate bond specified
Front U12–U13
Equipment shelfVerify the mounting hardware and any bonding required for the selected shelf.
1
2U
2U
10 in
0
8 lb
No power required
No separate bond specified
Front U11
Management serverDemo assumes protective earth through the power cord. Check the model instructions and project requirements for any separate chassis bond.
1
1U
1U
30 in
350
55 lb
Rackmount UPS 2 · Battery-backed
No separate bond specified
Front U9–U10
Analytics serverDemo assumes a manufacturer-approved chassis bonding point. Verify the terminal and hardware for the selected model.
1
2U
2U
30 in
620
55 lb
Rackmount UPS 1 · Battery-backed
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U7–U8
Video recording serverDemo assumes protective earth through the power cord. Check the model instructions and project requirements for any separate chassis bond.
1
2U
2U
27 in
350
38 lb
Rackmount UPS 1 · Battery-backed
No separate bond specified
Front U5–U6
Storage serverDemo assumes protective earth through the power cord. Check the model instructions and project requirements for any separate chassis bond.
1
2U
2U
30 in
600
55 lb
Battery-backed vertical PDU
No separate bond specified
Front U3–U4
Rackmount UPS 2Demo assumes a manufacturer-approved chassis bonding point. Verify the terminal and hardware for the selected model.
1
2U
2U
23 in
—
43 lb
Circuit B
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Front U1–U2
Rackmount UPS 1Demo assumes a manufacturer-approved chassis bonding point. Verify the terminal and hardware for the selected model.
1
2U
2U
23 in
—
54 lb
Circuit A
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Rear U24
Patch panel
1
1U
1U
6 in
0
4 lb
No power required
Unit Bonding Conductor (UBC)Vertical rack bonding busbar (RBB)
Rear U23
AC-only PDU
1
1U
1U
3.5 in
0
2 lb
Rackmount UPS 2 · AC-only
No separate bond specified
Rear U21
Rear horizontal cable manager
1
1U
1U
1 in
0
2 lb
No power required
No separate bond specified
Rear U18
Cable manager
1
1U
1U
3.5 in
0
2 lb
No power required
No separate bond specified
Rear U13
Cable manager
1
1U
1U
3.5 in
0
2 lb
No power required
No separate bond specified
Rear U6
Cable manager
1
1U
1U
3.5 in
0
2 lb
No power required
No separate bond specified
Vertical 0U · Rear right
Battery-backed vertical PDU
1
0U
0U
—
0
7 lb
Rackmount UPS 1 · Battery-backed
No separate bond specified
Power sources
For the full equipment and power report, choose Export BOM + Power CSV under Rack Reports. The CSV includes circuit loads, continuous-limit status, A/B failover results, and estimated rack-room heat.
Rack-room heat estimate8,085 BTU/hr2,369.58 W local heat
Outlets are counted at the source each device plugs into. Add each PDU or UPS as its own equipment row to assign loads to it. Upstream watt and VA totals count each load once. Watts and VA for PDUs and UPSs show the load on their outlets. Current is tracked at the wall circuit, PDU input, and UPS output. Current uses entered input amps or VA when available. Watts-only entries use the specified input power factor or the 0.90 planning assumption.
Power source
Level
Outlets
Entered watts
Entered VA
Est. current
Source limits
Circuit A
Wall circuit20 A breaker · 120 V AC
NEMA L5-20R
1 / 2 used1 free
2,112.24 W
N/A
18.3 A120 V AC · Includes watts converted using input PF2.3 A over continuous planning limit
20 A breaker
Circuit B
Wall circuit20 A breaker · 120 V AC
NEMA L5-20R
1 / 2 used1 free
992.34 W
N/A
8.6 A120 V AC · Includes watts converted using input PF
20 A breaker
Rackmount UPS 1
UPS outputFed by Circuit A
Battery-backed · 5 / 8 used3 free
AC-only · 0 / 2 used2 free
1,990 WBattery-backed · 1,990 WAC-only · 0 W
2,130 VA
17.8 A120 V AC · From amps or VA
2,160 W / 2,400 VA
AC-only PDU
PDU inputFed by Rackmount UPS 2 · AC-onlyVerify UPS outlet and outlet-group limits.
1 / 8 used7 free
620 W
650 VA
5.4 A120 V AC · From amps or VA9.58 A estimated remaining
15 A / 1,800 W
Battery-backed vertical PDU
PDU inputFed by Rackmount UPS 1 · Battery-backedVerify UPS outlet and outlet-group limits.
1 / 8 used7 free
600 W
630 VA
5.3 A120 V AC · From amps or VA9.75 A estimated remaining
15 A / 1,800 W
Rackmount UPS 2
UPS outputFed by Circuit B
Battery-backed · 2 / 6 used4 free
AC-only · 1 / 4 used3 free
970 WBattery-backed · 350 WAC-only · 620 W
1,225 VA
10.2 A120 V AC · From amps or VA
1,440 W / 1,500 VA
Unresolved checks
Conflicts (2)
Conflict
Storage server and Cable manager (U6) · Depth conflict. Chassis overlap by 5.5 in (33.5 in combined depth, 28 in between posts).
Conflict
Circuit A · 18.34 A continuous-equivalent load exceeds the 16 A continuous planning limit.
Needs verification
48-port PoE switch · 1 note
Verify
48-port PoE switch · specify the unit bonding conductor (UBC) part number.
24-port PoE switch · 1 note
Verify
24-port PoE switch · specify the unit bonding conductor (UBC) part number.
Battery-backed vertical PDU · 1 note
Verify
Battery-backed vertical PDU · verify 0U clearance for rear cables and service access.
Rack-wide checks · 2 notes
Verify
Vertical rack bonding busbar (RBB) · verify 0U clearance for rear cables and service access.
Verify
Circuit B · verify current against the 16 A continuous planning limit. Some current is estimated from watts and power factor.
Entered fit dimensions
Each status applies to that dimension. Check the unresolved list for shared space, rack type, and hardware.
Equipment
Dimension
Required
Available
Result
24-port patch panel
Chassis + cable / vent space behind it
8 in
33 in
Fits
24-port patch panel
Clearance outside mounting plane
2 in
4 in
Fits
48-port PoE switch
Chassis + cable / vent space behind it
20 in
33 in
Fits
48-port PoE switch
Clearance outside mounting plane
3 in
4 in
Fits
Video recording server
Rail post spacing
24–30 in
28 in
Fits
Video recording server
Chassis + cable / vent space behind it
31 in
33 in
Fits
Video recording server
Clearance outside mounting plane
1 in
4 in
Fits
Rackmount UPS 1
Rail post spacing
22–32 in
28 in
Fits
Rackmount UPS 1
Chassis + cable / vent space behind it
27 in
33 in
Fits
Rackmount UPS 1
Clearance outside mounting plane
1 in
4 in
Fits
Rear horizontal cable manager
Chassis + cable / vent space behind it
2 in
32 in
Fits
Rear horizontal cable manager
Clearance outside mounting plane
2 in
5 in
Fits
Patch panel
Chassis + cable / vent space behind it
8 in
32 in
Fits
Patch panel
Clearance outside mounting plane
2 in
5 in
Fits
Analytics server
Rail post spacing
24–32 in
28 in
Fits
Analytics server
Chassis + cable / vent space behind it
32 in
33 in
Fits
Analytics server
Clearance outside mounting plane
0 in
4 in
Fits
AC-only PDU
Chassis + cable / vent space behind it
5.5 in
32 in
Fits
AC-only PDU
Clearance outside mounting plane
2 in
5 in
Fits
Cable manager
Chassis + cable / vent space behind it
2 in
33 in
Fits
Cable manager
Clearance outside mounting plane
0 in
4 in
Fits
Cable manager
Chassis + cable / vent space behind it
6 in
33 in
Fits
Cable manager
Clearance outside mounting plane
0 in
4 in
Fits
Patch panel
Chassis + cable / vent space behind it
8 in
33 in
Fits
Patch panel
Clearance outside mounting plane
0 in
4 in
Fits
24-port PoE switch
Chassis + cable / vent space behind it
20 in
33 in
Fits
24-port PoE switch
Clearance outside mounting plane
2 in
4 in
Fits
Storage server
Rail post spacing
24–32 in
28 in
Fits
Storage server
Chassis + cable / vent space behind it
32 in
33 in
Fits
Storage server
Clearance outside mounting plane
0 in
4 in
Fits
Rackmount UPS 2
Rail post spacing
24–32 in
28 in
Fits
Rackmount UPS 2
Chassis + cable / vent space behind it
23 in
33 in
Fits
Rackmount UPS 2
Clearance outside mounting plane
0 in
4 in
Fits
Management server
Rail post spacing
24–32 in
28 in
Fits
Management server
Chassis + cable / vent space behind it
32 in
33 in
Fits
Management server
Clearance outside mounting plane
0 in
4 in
Fits
Equipment shelf
Chassis + cable / vent space behind it
10 in
33 in
Fits
Equipment shelf
Clearance outside mounting plane
0 in
4 in
Fits
Cable manager
Chassis + cable / vent space behind it
3.5 in
32 in
Fits
Cable manager
Clearance outside mounting plane
0 in
5 in
Fits
Cable manager
Chassis + cable / vent space behind it
3.5 in
32 in
Fits
Cable manager
Clearance outside mounting plane
0 in
5 in
Fits
Cable manager
Chassis + cable / vent space behind it
3.5 in
32 in
Fits
Cable manager
Clearance outside mounting plane
0 in
5 in
Fits
Bill of materials
Qty
Item
U per item
Total U
Manufacturer
Part number
Location
1
24U Floor cabinet
—
—
—
Needs part number
Rack 01
1
24-port patch panel (1U · 19 in wide · 4 in deep)
1U
1U
—
Needs part number
Front U24
6
Example unit bonding conductor
—
—
—
DEMO-UBC
24-port patch panel · Front U24; Rackmount UPS 1 · Front U1–U2; Patch panel · Rear U24; Analytics server · Front U9–U10; Patch panel · Front U21; Rackmount UPS 2 · Front U3–U4
1
48-port PoE switch (1U · 19 in wide · 18 in deep)
1U
1U
—
Needs part number
Front U23
1
UBC with model-specific chassis terminal and RBB lug
—
—
—
Needs part number
48-port PoE switch · Front U23
1
Video recording server (2U · 19 in wide · 27 in deep · 4-post)
2U
2U
—
Needs part number
Front U7–U8
1
Rackmount UPS 1 (2U · 19 in wide · 23 in deep · 4-post)
2U
2U
—
Needs part number
Front U1–U2
1
Rear horizontal cable manager (1U · 19 in wide · 1 in deep)
1U
1U
—
Needs part number
Rear U21
1
Patch panel (1U · 19 in wide · 6 in deep)
1U
1U
—
Needs part number
Rear U24
1
Analytics server (2U · 19 in wide · 30 in deep · 4-post)
2U
2U
—
Needs part number
Front U9–U10
1
AC-only PDU (1U · 19 in wide · 3.5 in deep)
1U
1U
—
Needs part number
Rear U23
1
Cable manager (1U · 19 in wide · 2 in deep)
1U
1U
—
Needs part number
Front U22
1
Cable manager (1U · 19 in wide · 6 in deep)
1U
1U
—
Needs part number
Front U20
1
Patch panel (1U · 19 in wide · 4 in deep)
1U
1U
—
Needs part number
Front U21
1
24-port PoE switch (1U · 19 in wide · 18 in deep)
1U
1U
Cisco
Needs part number
Front U19
1
UBC with Cisco chassis ring terminal (included with switch) and RBB lug
—
—
—
Needs part number
24-port PoE switch · Front U19
1
Storage server (2U · 19 in wide · 30 in deep · 4-post)
2U
2U
—
Needs part number
Front U5–U6
1
Blanking panel (5U · 19 in wide)
5U
5U
—
Needs part number
Front U14–U18
1
Battery-backed vertical PDU (0U)
0U
0U
—
Needs part number
0U Rear right
1
Rackmount UPS 2 (2U · 19 in wide · 23 in deep · 4-post)
2U
2U
—
Needs part number
Front U3–U4
1
Management server (1U · 19 in wide · 30 in deep · 4-post)